50kW On-grid Inverter’s Installation
- filturesolar
- Aug 29, 2024
- 1 min read
The most difficult part is the original AC distribution box containing 600A circuit breaker and MERALCO wires does not have enough space to accommodate the square type of CT sensors.
Comentários